Wednesday, 2 September 2009

Road Trip!!!


Sorry I've not updated this in some time. The reason, we decided to go on a roadtrip around the east coast with Sheila so the rush was on to try and get her habitable before we went. We've just got back and the pics of Sheila are below. The next trip out is when Eli is home, next week :o)







Electric hookup - I hate cutting holes in the body work, I always worry it's going to go wrong



Cupboards and smoke/Co2 detector



Seating Area


Kitchen with Sink and hob



Rear end, where the bikes go. The curtains at the top are where Eloise's bed is.









Zig unit where all the electrics go back to.






Me and Sheila



The seat pulls out to become the bed






Man cupboard above the cab with pockets to the left and right for the ramps, hookup cable etc







Under the seat still needs some doors


Bog and door that folds back on itself


Bog door


Fridge

That's it for now but I'll plough on. It was really comfy and Zoe and I had a fantastic time touring round Southwold, Waxham, Cromer, Sherringham and sunny hunny.

Tuesday, 16 June 2009

What a difference a weekend makes

A day does indeed make a difference. I had already made up the basic frame for the seat/bed but the rest was a sunny Saturday and a lot of effort. In no particular order:




Shelf above the cab which will be a cupboard. The speakers have also been fitted and wired up


Soon to be cupboard from the back, you can also see the fan which vents Sheila, and also the new windscreen and rubber which saves her leaking like a bloomin seive



Kingspan insulation has gone down and plywood on top. I've also put the seat carcass in and you can also just see some bolts which are where the old seats were bolted to but will tie the whole thing down so it doesn't all move forward when I brake







Insulation in the ceiling, and ply on top




This is the best thing since sliced bread. It's from a company called noisekiller and it mutes the engine noise in the cab. You get the matting, under bonnet stickie things, and also a blanket for the bulk head.





Sound insulation down, and new mat on top







Noise killer again, we went for a spin down the a14 when we'd finished and it was quiet as a mouse........result :o)






View from the back. One thing I did foget to list was the tinting on the windows, cheap as chips from ebay and makes all the difference. Can't wait to keep on going and getting more and more done. The next thing is to keep going with the roof which is a pain but will be the hardest thing, and once done, it should be a breeze from there.....famous last words!!!








Wednesday, 15 April 2009

Sheila does Rochdale

We took Sheila up to Rochdale at the weekend and had 300 miles of trouble free driving, apart from the stereo going pop as we pulled of the driveway, typical :D
The bikes fitted happily in the back and using the anchor points where the seats were, kept them from moving.



I fitted my new stereo last night which is now working, so hopefully this one won't go the same way as the last.



The floor is also back up for the final bit of welding that needs doing so hopefully the build can commence in earnest from here !!






Monday, 6 April 2009

Sheila - Out and About

This weekend we had a few outings in Sheila, just to see how she runs before we go for the 200+ miles to Rochdale on Good Friday. On Saturday we went to Thaxted (not for the pub food :o) ) and then went to Thetford on Sunday.




She ran well and has a service on Thursday so anything dodgy should come out of that.
The welding is now finished too and I've treated and primed the other rust spots. You'll also notice the roof vent is on and working a treat. Runs like a dream and there's been no condensation, result!!! :o)

Another good bit of news is that the seats were on ebay last week and went for £127 so that should be enough to complete the rest of the project.


So, to date the costs are:


Sink, Hob £85.00


Zig Unit £64.00


Roof Vent £67.00


Split Charge £14.99


Connectors and lights £43.85


Porta Loo £36.23


Fridge £123.00


Heater £90


Seats Sold -£127


Welding £150



Total £ 547.07



The build has really been delayed cause of the welding but now it's done, there is no stopping me, apart from the Easter weekend when we're away in Rochdale!!

Stay tuned!!


Tuesday, 24 March 2009

Update.....

Big news - Sheila now has no seats, and the floor is up!!!

Bad news - She is having some welding done today to get rid of the holes I found when I pulled the flooring up :o)

Pics below of her pre-operated state!!





Tuesday, 10 March 2009

Cost to Date

Sheila's cost to date breaks down as:

Sink, Hob £85.00
Zig Unit £64.00
Roof Vent £67.00
Split Charge £14.99
Connectors and lights £43.85
Porta Loo £36.23
Fridge £123.00


Total £ 434.07

I don't think it's a bad total, especially as the big stuff has been purchased. The only other potentially pricy things are going to be the heater, and if I decide to get a water heater, which we are still unsure about


Chris

Monday, 9 March 2009

Bits & Bobs For Sheila

Moving day is rapidly approaching (Friday) so the only work that has been done to Sheila is the purchasing of ebay bargains :o)


The kit list is mounting and I'll list below what I've bought so far.


Yesterday Sheila got her first outing with Eloise and Zoe. They've seen her, followed her, but never been in her. Eloise loves it and it still gives me a massive grin when I drive her. Role on summer!!!



Right, Here we go:



Zig Unit for elecy


Roof Vent to stop condensation. This cost a bit but it will be worth it as it's silent running :o)



The heart of any vehicle the ICE. I probably didn't need this, but it has to be done :o)




Split charging kit for the leisure battery





Sink and Cooker. Now this was a bargain!!





Side Lights so we can see




Front lights for the roof




Bog at another bargain price (£30)!!




Fridge (why are these things so bloomin expensive?!?!?!)


And that's it for now. Hopefully once we've moved on Friday, I can start taking the seats out on Saturday or Sunday......we'll have to see how the unpacking is :o)



P.S I alomst forgot the most important thing that I've bought to date:





Rust Remover!!!


Tuesday, 24 February 2009

Work Begins

A quick update as to where we are
I did say that we couldn't start on it until we moved, but we found things to do. Firstly we took the lettering off, Zoe and Eli did most of it, until Eli hurt her finger nail and decided to scooter instead.

Whilst Zoe continued with the letter removal I started on the lining removal. I had noticed some damp patches and was prepared to be shocked, but only found 2 bits of rust which corresponds with the rust outside.

Next job, buy some rust removal and filler :o)



The heart of the beast

A little rust
A matching pair


Looking Good